KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  11-5-2008
Number of Hours:  1.50
Manual Reference:  12-7
Brief Description:  Engine baffle preparation

Today I prepared the side baffles of cylinders 1 and 2 by edge finishing them, then drilling, deburring and dimpling the attaching doubler plates. Following this I edge finished two baffle support brackets and drilled the bolt holes to final size. I finished the day by fabricating an attach bolt bushing.
' style=

Cyliner 1 and 2 side baffles

Cyliner 1 and 2 side baffles

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.